Here you can see the stream, the proximity of the valves and the vegetation on the stream bank
IMG_1246

Our teams initiated the project by clearing the bank of vegetation and eliminating the trees.

IMG_1250
Once the vegetation was cleared our client could properly asses the site. 
IMG_1521
The valve is situated beneath the water table, and excavating down to this level would result in encroachment upon the stream.
IMG_1315

(after creating a plan) we delivered materials to the site. 

IMG_1272
Our teams installed temporary flumes and dams then proceeded to pump the water from outside the designated working area.
000125F3-A12A-4F12-8D7C-40899C2784B0
In this image, you can observe that the water has been drained, leaving the working area dry.
03b45239-bd5a-4127-9b2b-bad73e4046d2
903C8A7D-9EE2-4F4B-91EE-7744D68E9E85-1
Gabon basket retaining wall, with coir mesh to prevent soil erosion prior to grass seed establishment

A valued client reached out to MRF Contracting for assistance with a repair project on a water main near a stream. They expressed concerns about the valve's proximity to the water table, which was within 2 meters of the stream bank. MRF Contracting was entrusted with the responsibility of safeguarding the stream from potential silt intrusion during the excavation process.

 

Following the completion of the project, we implemented Gabion baskets to shield the bank from erosion. We then reinstated the subsoil to its original depth, followed by topsoiling to its original height. This topsoil was seeded, and to prevent runoff, a coir mat was applied on the bank.